What was found
HKG - DURING C/D CHECK, NR 1 PYLON HAS EVIDENCE OF OVERHEAT DAMAGE, PARTIALLY REPAIRED PREVIOUSLY. NR 1 PYLON SIDE FRAMES REPLACED AT NAC STATION 183 L/R, 210 L/R, 236 L/R, 253 L/R. STIFFENERS REPLACED NR 1 NAC STATION 221-265 LEFT, NR 2 STATION 193-221 L/R, NR 3 STATION 180-221 L/R. REPLACED MID SPAR WEB PANEL NAC STATION 186-242. REPAIRED L/R MID SPAR CHORDS NAC STATION 180-206. REPAIRED LEFT SKIN NAC STATION 180-236. REPAIRED LEFT SKIN NACE STATION 236-253. ALL REPAIRS ACCOMPLISHED PER RS-R-54-00-34112, 8110-3. (M)