What was found
MZJ - DURING 'C5' CHECK, FORWARD PIT, FLOOR SUPPORT FRAME CRACKED IN UPPER CHORD RADIUS AT BS 351 FROM STR 25R - STR 26R, AND STR 28R - STR 29R. REPAIRED FLOOR SUPPORT FRAME WITH WELDING REPAIR DPS 10-225. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MZJ - DURING 'C5' CHECK, FORWARD PIT, FLOOR SUPPORT FRAME CRACKED IN UPPER CHORD RADIUS AT BS 351 FROM STR 25R - STR 26R, AND STR 28R - STR 29R. REPAIRED FLOOR SUPPORT FRAME WITH WELDING REPAIR DPS 10-225. (X)