What was found
MZJ - DURING C-CHECK, MAIN DECK FLOORBEAM AT BS 229 HAS CORROSION AT RBL 23. REPAIRED FLOORBEAM PER SRM 53-40-00 FIG 6L. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MZJ - DURING C-CHECK, MAIN DECK FLOORBEAM AT BS 229 HAS CORROSION AT RBL 23. REPAIRED FLOORBEAM PER SRM 53-40-00 FIG 6L. (M)