SDR EIAA980237

Service difficulty report · Seal · Doug DC933F

Difficulty date
August 24, 1998
Submitted
March 26, 2000
Operation
Air carrier
Aircraft
N944F
Make and model
Doug DC933F
Aircraft serial
47194
Part
Seal
Condition
Failed
Location
Cargo Door
Stage of operation
CL
Nature of condition
E
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

SEA - DURING CLIMB, PASSING 4 PSI DIFFERENTIAL, A LOAD PULSATING HUM, VIBRATION AND AIR NOISE WAS HEARD FROM MAIN CABIN. PRESSURIZATION BECAME UNCONTROLLABLE. RETURNED TO SEA. REPLACED FORWARD UPPER CARGO DOOR PRESSURE SEAL PER MM 52-32-01. PRESSURIZATION CHECK NORMAL. (M)

More about the Doug DC-9-33F