What was found
UPON A SCHEDULED INSPECTION AT AERO CORP IN LAKE CITY, FL, THE VERTICAL STAB RIGHT TRAILING EDGE PANEL AT NR 2 ENGINE HOIST MOUNT PAD HAS BULGING CORROSION. OPENED AREA, REMOVED CORROSION, FABRICATED AND INSTALLED THREE SKIN PANELS AND ONE RAIN GUTTER IAW B727 SRM 54-30-2. (M)