What was found
CORROSION AT FORWARD LAV FLOOR PANEL BETWEEN STATION 290-300. REMOVED BAD PART OF FLOOR, FABRICATED NEW PIECE AND DOUBLER PER SRM 57-10-6. INSTALLED FABRICATED PANEL AND DOUBLER PER SRM 51-10-1.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CORROSION AT FORWARD LAV FLOOR PANEL BETWEEN STATION 290-300. REMOVED BAD PART OF FLOOR, FABRICATED NEW PIECE AND DOUBLER PER SRM 57-10-6. INSTALLED FABRICATED PANEL AND DOUBLER PER SRM 51-10-1.