What was found
FOUR EACH FLOOR SUPPORT WEBS CRACKED AT AFT BULKHEAD LBL 40 TO RBL 35. FABRICATED AND INSTALLED NEW WEBS PER SRM 51-10-02 AND SRM 51-40-03. TT: 66,991:57 HOURS. TC: 45,084. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FOUR EACH FLOOR SUPPORT WEBS CRACKED AT AFT BULKHEAD LBL 40 TO RBL 35. FABRICATED AND INSTALLED NEW WEBS PER SRM 51-10-02 AND SRM 51-40-03. TT: 66,991:57 HOURS. TC: 45,084. (X)