What was found
DURING CLIMB-OUT, NR 1 STRUT OVERHEAT LIGHT ILLUMINATED. REDUCING THRUST PER ABNORMAL CHECK LIST EXTINGUISHED LIGHT. GENERATED FROM PILOT REPORT. REPOSITIONED AND TIGHTENED CLAMP ON PNEUMATIC DUCT NR 1 ENGINE. RAN ENGINE, LEAK CHECK GOOD. (M)