As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
ENGINE HAS 2013.9 HRS SINCE OVERHAUL BY PRATT & WHITNEY. REMOVED FROM AIRCRAFT DUE TO HIGH OIL CONSUMPTION. USED 5QTS OF OIL IN 10.8 HRS; SUSPECTED COMP SEAL LEAK. RETURNING ON ERA REPAIR ORDER RW-887792 REQUESTING WARRANTY REPAIR DUE TO SUCH LOW TIME ON ENGINE.