What was found
PERFORMED 6 MONTH INSPECTION. FLOAT HAS TORN END CAP, AND LEAK IN NR 2 CELL. PERFORMED 6 MONTH INSPECTION, REPLACED END CAP, & REPAIRED LEAK.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PERFORMED 6 MONTH INSPECTION. FLOAT HAS TORN END CAP, AND LEAK IN NR 2 CELL. PERFORMED 6 MONTH INSPECTION, REPLACED END CAP, & REPAIRED LEAK.