SDR ERAA087100

Service difficulty report · Engine

Difficulty date
May 20, 2003
Submitted
June 16, 2003
Operation
Air carrier
Engine
Allsn 250C20B
Part
Engine
Condition
Making Metal
Part time
14,386 hours
Stage of operation
NR
How discovered
9
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ENGINE MAKING METAL. FOUND TURBINE