What was found
RT FLOAT ASSY DUE INSPECTION. COVER WORN. FWD END CAP DETERIORATED CYLINDER DUE HYDRO TEST 4/04. FLOAT BRG DELAMINATED AT FOREWARD GIRT. PERFORMED 18 MONTH INSPECTION. CHANGED FLOAT BOTTLE, FLOAT BRG, MANIFOLD AND FLOAT COVERS. REPAIRED WIRE HARNESS AND REPLACED RIVNUTS IN SUPPORT TUBE. CHECKED FOR COMPLIANCE WITH 120-81-3, 120-81-4, 120-82-4, 120-84-1, 802-25-1 AND 802-25-2.