SDR ERAA097508

Service difficulty report · Engine

Difficulty date
July 24, 2004
Submitted
October 4, 2004
Operation
Air carrier
Engine
Allsn 250C20B
Part
Engine
Condition
Making Metal
Part time
8,653 hours
Stage of operation
NR
How discovered
9
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ENGINE MAKING METAL. INSTALLED SERVICEABLE GEARBOX AND COMPRESSOR, C/W CEB-A-1392, C/W E CHECK INSPECTION.