What was found
DEN - DURING C-2 CHECK INSPECTION, REPORTED CORROSION ON TOP OF FLOORBEAM AT STATION 295.0, RBL 10. MAINTENANCE REPLACED FLOORBEAM PER FRONTIER ENGINEERING AUTHORIZATION 53-737-082 AND SRM 51-30-02. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DEN - DURING C-2 CHECK INSPECTION, REPORTED CORROSION ON TOP OF FLOORBEAM AT STATION 295.0, RBL 10. MAINTENANCE REPLACED FLOORBEAM PER FRONTIER ENGINEERING AUTHORIZATION 53-737-082 AND SRM 51-30-02. (M)