What was found
DEN - DURING C-2 CHECK INSPECTION, REPORTED STRINGER TIE CLIP CRACKED AT STATION 639, STRINGER 8L. MAINTENANCE FABRICATED AND DRILLED REPLACEMENT CLIP AND INSTALLED CLIP PER SRM 51-20-01 AND 51-30-02. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DEN - DURING C-2 CHECK INSPECTION, REPORTED STRINGER TIE CLIP CRACKED AT STATION 639, STRINGER 8L. MAINTENANCE FABRICATED AND DRILLED REPLACEMENT CLIP AND INSTALLED CLIP PER SRM 51-20-01 AND 51-30-02. (M)