What was found
DURING C-7 CHECK, INSPECTION REPORTED CARGO BEAM CORRODED AT FLOOR PANEL SPLICE, STA 770, RBL 8. FABRICATED AND INSTALLED REPAIR PER SRM 53-10-1, 53-10-3 AND 53-10-5.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-7 CHECK, INSPECTION REPORTED CARGO BEAM CORRODED AT FLOOR PANEL SPLICE, STA 770, RBL 8. FABRICATED AND INSTALLED REPAIR PER SRM 53-10-1, 53-10-3 AND 53-10-5.