What was found
DURING C-7 CHECK, INSPECTION REPORTED FLOORBEAM AT STA 528, RBL 10, CORRODED. REMOVED DAMAGED PORTION OF FLOORBEAM UPPER CHORD PER SRM 51-30-2. FABRICATED AND INSTALLED REPLACEMENT UPPER CHORD PER SRM 53-10-9.