What was found
DURING C-7 CHECK, INSPECTION REPORTED FLOORBEAM IN CARGO COMPARTMENT CORRODED AT RBL 8 AND PANEL SPLICE AT STA 770 OUT OF LIMITS. FABRICATED REPAIR ANGLES AND INSTALLED PER SRM 53-10-5.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-7 CHECK, INSPECTION REPORTED FLOORBEAM IN CARGO COMPARTMENT CORRODED AT RBL 8 AND PANEL SPLICE AT STA 770 OUT OF LIMITS. FABRICATED REPAIR ANGLES AND INSTALLED PER SRM 53-10-5.