What was found
DURING C-7 CHECK, INSPECTION REPORTED FLOOR FRAME AT STA 480, STR 27-L, IN FWD CARGO COMPARTMENT CORRODED. FABRICATED REPLACEMENT FLOOR FRAME AND INSTALLED REPAIR PER SRM 53-10-4.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-7 CHECK, INSPECTION REPORTED FLOOR FRAME AT STA 480, STR 27-L, IN FWD CARGO COMPARTMENT CORRODED. FABRICATED REPLACEMENT FLOOR FRAME AND INSTALLED REPAIR PER SRM 53-10-4.