What was found
DURING C-3 CHECK, INSPECTION REPORTED TOP OF FLOORBEAM CORRODED AT STA 1016, FROM CENTER TO 30 LBL. FABRICATED AND INSTALLED REPLACEMENT FLOORBEAM TOP CAP PER SRM 51-30-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-3 CHECK, INSPECTION REPORTED TOP OF FLOORBEAM CORRODED AT STA 1016, FROM CENTER TO 30 LBL. FABRICATED AND INSTALLED REPLACEMENT FLOORBEAM TOP CAP PER SRM 51-30-02.