What was found
DURING C-3 CHECK, INSPECTION REPORTED FLOORBEAM INTERCOSTAL CORRODED FROM STA 1006 TO STA 1016, BL 0. FABRICATED AND REPLACED INTERCOSTAL PER SRM 53-10-2 AND 51-30-2.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-3 CHECK, INSPECTION REPORTED FLOORBEAM INTERCOSTAL CORRODED FROM STA 1006 TO STA 1016, BL 0. FABRICATED AND REPLACED INTERCOSTAL PER SRM 53-10-2 AND 51-30-2.