What was found
DURING C-3 CHECK, INSPECTION REPORTED INTERCOSTAL AT STA 986 TO STA 1006, RBL 3, CORRODED. FABRICATED AND INSTALLED REPLACEMENT INTERCOSTAL PER SRM 51-30-2 AND EA 53-737-158.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-3 CHECK, INSPECTION REPORTED INTERCOSTAL AT STA 986 TO STA 1006, RBL 3, CORRODED. FABRICATED AND INSTALLED REPLACEMENT INTERCOSTAL PER SRM 51-30-2 AND EA 53-737-158.