What was found
DURING C-4 CHECK, INSPECTION REPORTED FRAME CRACKED AT BS 663.75, STR 1R AND 2R. REMOVED DAMAGE IN FRAME PER SRM 53-00-07 FIG 209. FABRICATED FILLERS AND REPAIRED AND INSTALLED FRAME PER SRM 53-00-07 FIG 209.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-4 CHECK, INSPECTION REPORTED FRAME CRACKED AT BS 663.75, STR 1R AND 2R. REMOVED DAMAGE IN FRAME PER SRM 53-00-07 FIG 209. FABRICATED FILLERS AND REPAIRED AND INSTALLED FRAME PER SRM 53-00-07 FIG 209.