What was found
DURING C-2 CHECK, INSPECTION REPORTED UPPER HINGE FAIRING AT L1 DOOR BENT AT FWD END AND CRACKED AT AFT END. FABRICATED AND INSTALLED REPLACEMENT UPPER L1 DOOR HINGE FAIRING PER SRM 51-30-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-2 CHECK, INSPECTION REPORTED UPPER HINGE FAIRING AT L1 DOOR BENT AT FWD END AND CRACKED AT AFT END. FABRICATED AND INSTALLED REPLACEMENT UPPER L1 DOOR HINGE FAIRING PER SRM 51-30-01.