What was found
DURING C-2 CHECK, INSPECTION REPORTED CORROSION ON INTERCOSTAL AT STA 500A TO 500B, RBL 25. FABRICATED AND INSTALLED REPLACEMENT INTERCOSTAL PER BOEING DRAWING 69-41473, SRM 51-30-2 AND SOPM 20-41-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-2 CHECK, INSPECTION REPORTED CORROSION ON INTERCOSTAL AT STA 500A TO 500B, RBL 25. FABRICATED AND INSTALLED REPLACEMENT INTERCOSTAL PER BOEING DRAWING 69-41473, SRM 51-30-2 AND SOPM 20-41-02.