What was found
DURING C-7 CHECK, INSPECTION REPORTED CORROSION ON UNDERSIDE OF CARGO FLOORBEAM AROUND NUT PLATE, BS 727E +2, RBL 8. REMOVED DAMAGED AREA, FABRICATED AND INSTALLED REPLACEMENT PARTS PER SRM 51-41-02, 53-00-53, AND SOPM 20-41-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-7 CHECK, INSPECTION REPORTED CORROSION ON UNDERSIDE OF CARGO FLOORBEAM AROUND NUT PLATE, BS 727E +2, RBL 8. REMOVED DAMAGED AREA, FABRICATED AND INSTALLED REPLACEMENT PARTS PER SRM 51-41-02, 53-00-53, AND SOPM 20-41-02.