What was found
DURING C-7 CHECK, INSPECTION REPORTED CORROSION FWD LAVATORY AT BS 294.5, STR 4L CORRODED. FABRICATED AND INSTALLED NEW INTERCOSTAL T-CHORD AND SHIM PER SRM 51-40-02, SOPM 20-41-02 AND EA 53-737-178.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-7 CHECK, INSPECTION REPORTED CORROSION FWD LAVATORY AT BS 294.5, STR 4L CORRODED. FABRICATED AND INSTALLED NEW INTERCOSTAL T-CHORD AND SHIM PER SRM 51-40-02, SOPM 20-41-02 AND EA 53-737-178.