What was found
DURING C-4 CHECK, INSPECTION REPORTED CORROSION ON AFT CARGO BIN LT FLOOR SUPPORT ZEE CHANNEL. FOUND TO BE OUT OF LIMITS PER SRM 53-60-53. FABRICATED PARTS PER SRM 53-60-53 & SOPM 20-41-02. INSTALLED PART PER SRM 51-40-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-4 CHECK, INSPECTION REPORTED CORROSION ON AFT CARGO BIN LT FLOOR SUPPORT ZEE CHANNEL. FOUND TO BE OUT OF LIMITS PER SRM 53-60-53. FABRICATED PARTS PER SRM 53-60-53 & SOPM 20-41-02. INSTALLED PART PER SRM 51-40-02.