What was found
DURING C-4 CHECK, INSPECTION REPORTED TOP SURFACE OF I-BEAM AT STA 986.5 CORRODED. BLENDED CORROSION AND FOUND TO BE OUT OF LIMITS PER SRM 53-60-51, FIG 101. REMOVED DAMAGED UPPER CAP OF FLOORBEAM PER SRM 53-00-51, FIG 202. FABRICATED AND INSTALLED REPAIR PARTS PER SRM 53-00-51, FIG 202 AND SOPM 20-41-02.