What was found
DURING C-4 CHECK, INSPECTION REPORTED CORROSION ON FLOORBEAM AT STA 1016, RBL 29. FABRICATED AND INSTALLED REPLACEMENT PARTS PER SRM 53-30-51, PAGES 203-208.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-4 CHECK, INSPECTION REPORTED CORROSION ON FLOORBEAM AT STA 1016, RBL 29. FABRICATED AND INSTALLED REPLACEMENT PARTS PER SRM 53-30-51, PAGES 203-208.