What was found
DURING C-4 CHECK, INSPECTION REPORTED CORROSION ON FLOORBEAM CAP AT STA. 312, LBL 13 TO RBL 10. BLENDED CORROSION AND FOUND TO BE OUT OF LIMITS PER SRM 53-10-01. FABRICATED AND INSTALLED NEW CAP PER SRM 53-10-1.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-4 CHECK, INSPECTION REPORTED CORROSION ON FLOORBEAM CAP AT STA. 312, LBL 13 TO RBL 10. BLENDED CORROSION AND FOUND TO BE OUT OF LIMITS PER SRM 53-10-01. FABRICATED AND INSTALLED NEW CAP PER SRM 53-10-1.