What was found
DURING C-CHECK, INSPECTION REPORTED CORROSION ON FLOORBEAM UPPER CHORD AT STA 294.5, RBL 38.5. FABRICATED AND INSTALLED NEW SECTION OF FLOORBEAM PER SRM 53-10-51.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-CHECK, INSPECTION REPORTED CORROSION ON FLOORBEAM UPPER CHORD AT STA 294.5, RBL 38.5. FABRICATED AND INSTALLED NEW SECTION OF FLOORBEAM PER SRM 53-10-51.