What was found
DURING C-7 CHECK, INSPECTION REPORTED AFT CARGO COMPARTMENT FLOOR STRINGER AND NUT PLATE CORRODED AFT OF STA 727A, RT MID STRINGER. REPAIRED AFT CARGO COMPARTMENT FLOORBEAM PER SRM 53-00-53 FIG 201.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-7 CHECK, INSPECTION REPORTED AFT CARGO COMPARTMENT FLOOR STRINGER AND NUT PLATE CORRODED AFT OF STA 727A, RT MID STRINGER. REPAIRED AFT CARGO COMPARTMENT FLOORBEAM PER SRM 53-00-53 FIG 201.