What was found
DURING C-7 CHECK, INSPECTION REPORTED FLOORBEAM AT STA 950, RBL 26 TO RBL 49, WL 208 CORRODED AT FLOORBOARD HOLES. FABRICATED AND INSTALLED REPLACEMENT FLOORBEAM PER SRM 53-60-51 AND 51-10-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-7 CHECK, INSPECTION REPORTED FLOORBEAM AT STA 950, RBL 26 TO RBL 49, WL 208 CORRODED AT FLOORBOARD HOLES. FABRICATED AND INSTALLED REPLACEMENT FLOORBEAM PER SRM 53-60-51 AND 51-10-02.