What was found
DURING C-4 CHECK, INSPECTION REPORTED CORROSION ON FLOOR SUPPORT SEGMENT BETWEEN STA 967 AND STA 986, LBL 16. FABRICATED AND INSTALLED REPLACEMENT FLOOR SUPPORT SEGMENT PER SRM 51-10-02, 53-60-51, 51-20-01, 51-40-02 AND SOPM 20-41-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-4 CHECK, INSPECTION REPORTED CORROSION ON FLOOR SUPPORT SEGMENT BETWEEN STA 967 AND STA 986, LBL 16. FABRICATED AND INSTALLED REPLACEMENT FLOOR SUPPORT SEGMENT PER SRM 51-10-02, 53-60-51, 51-20-01, 51-40-02 AND SOPM 20-41-02.