Service difficulty report · Line · Airbus A318111

Difficulty date
June 30, 2006
Submitted
July 5, 2006
Operation
Air carrier
Aircraft
N803FR
Make and model
Airbus A318111
Aircraft serial
2017
Aircraft time
10,074 hours, 5,205 cycles
Part
Line
Condition
Leaking
Location
Hyd System
Stage of operation
CR
How discovered
O
Nature of condition
K, J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING CRUISE, FLIGHT CREW REPORTED -Y- HYDRAULIC SYSTEM LEVEL LOW. AS A PRECAUTIONARY MEASURE, AN EMERGENCY WAS DECLARED UPON LANDING AT PDX. REPLACED NR 2 ENGINE YELLOW SYSTEM CASE DRAIN RETURN LINE FOR LEAKING. RAN NR 2 ENGINE. OPS AND LEAK CHECKED NORMAL. NO LEAKS NOTED. REF AMM 29-13-49-000-008 AND 29-13-49-400-008.

More about the Airbus A318-111