Service difficulty report · Dummy Rail · Airbus A319112

Difficulty date
August 9, 2006
Submitted
August 22, 2006
Operation
Air carrier
Aircraft
N903FR
Make and model
Airbus A319112
Aircraft serial
1560
Aircraft time
17,309 hours, 7,621 cycles
Part
Dummy Rail
Condition
Corroded
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING C-4 CHECK, INSPECTION REPORTED CORROSION IN FWD LAV AREA, FR16 AND Y503.2. DUMMY RAIL WAS FOUND TO BE OUT OF LIMITS PER SRM 53-11-14. REMOVED CORRODED DUMMY RAIL PER SRM 51-42-11. LOCATED AND DRILLED NEW DUMMY RAIL PER SRM 51-44-11 AND AIRBUS DWG B2 D53110984. INSTALLED NEW DUMMY RAIL PER SRM 51-42-11 AND AIRBUS DWG B2 D53110984.

More about the Airbus A319-112