What was found
DURING C CHECK INSPECTION, CORROSION WAS FOUND ON THE INBOARD, RIGHT SIDE OF THE FLOORBEAM, FORWARD OF THE SPLICE AT FRAME 68 AND -Y1292, AT THE SECOND NUT PLATE HOLE. MAINTENANCE REMOVED AND REPLACED THE FLOORBEAM AND RELATED COUPLINGS IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 51-42-11, PARAGRAPH 7. THE MAINTENANCE ACTION REQUIRED TWO FLOORBEAMS, PART NUMBERS D5347217220500 AND D5347217220390. UPON COMPLETION OF THE MAINTENANCE ACTION, THE INSTALLATION WAS INSPECTED AND FOUND ACCEPTABLE.