What was found
DURING THE C3/S1 C CHECK, INSPECTION REPORTED THE RIGHT, FORWARD, MAIN LANDING GEAR DOOR, KEEL MOUNTED HINGE FITTING, AT THE AFT LUG, HAD A NICK IN ITS BOTTOM EDGE. MAINTENANCE BLENDED THE DAMAGE IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 51-73-00. PERFORMED HFEC (EDDY CURRENT) TESTING AND FOUND NO DEFECTS. THE PART WAS TREATED, PRIMED AND PAINTED IN ACCORDANCE WITH THE REQUIREMENTS OF EA A9-53R-30004. UPON COMPLETION OF THE REPAIR, THE PART WAS INSPECTED AND FOUND ACCEPTABLE.