As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING C1 C CHECK, INSPECTION REPORTED AFT CARGO PIT FLOOR PANEL 151VG WAS DAMAGED BEYOND REPARABLE LIMITS. MAINTENANCE REMOVED THE FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF AMM 53-42-14-000-001 AND REPLACED IT WITH A NEW FLOOR PANEL IN ACCORDANCE WITH THE REQUIREMENTS OF A319 SRM 51-42-11, PARAGRAPH 5. FOLLOWING THE REPLACEMENT OF THE FLOOR PANEL IT WAS INSPECTED AND FOUND ACCEPTABLE.