What was found
DURING C3 S1 C CHECK INSPECTION NOTED AFT CARGO LATERAL FLOORBOARD FRAMES AT FRAME 59 BETWEEN STRINGERS 38 LEFT AND 38 RIGHT HAS CORROSION AROUND NUT CLIP HOLES. MAINTENANCE REMOVED CORROSION ON CONNECTING ANGLES, FABRICATED NEW CONNECTING ANGLE. TREATED, PRIMED, TOP COATED AND INSTALLED NEW CONNECTING ANGLE IN ACCORDANCE WITH THE REQUIREMENTS OF SRM 51-42-11, SRM 51-74-00, SRM 51-21-11 AND SRM 51-75-00. UPON COMPLETION OF THE REPAIR IT WAS INSPECTED AND FOUND ACCEPTABLE.