What was found
DURING C4 C-CHECK, INSP NOTED THAT THE AFT LT EMERGENCY POWER SUPPLY UNIT BATTERY FAILS CAPACITY CHECK. MX REMOVED AND REPLACED THE EMERGENCY POWER SUPPLY UNIT AND PERFORMED OPS CHECK IAW AMM 33-51-38 PB 401.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C4 C-CHECK, INSP NOTED THAT THE AFT LT EMERGENCY POWER SUPPLY UNIT BATTERY FAILS CAPACITY CHECK. MX REMOVED AND REPLACED THE EMERGENCY POWER SUPPLY UNIT AND PERFORMED OPS CHECK IAW AMM 33-51-38 PB 401.