What was found
DEPLOY R1 DOOR SLIDE, DUE TO INABILITY TO INSTALL PIN FOR INFLATION BOTTLE. SLIDE REPLACED ON PEMCO NR 1779N176. PERFORMED OPERATIONAL TEST OF ESCAPE SLIDE DEPLOYMENT IAW AMM 25-62-00-710-051-A TIME TO FULLY DEPLOY 8.32 SECONDS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DEPLOY R1 DOOR SLIDE, DUE TO INABILITY TO INSTALL PIN FOR INFLATION BOTTLE. SLIDE REPLACED ON PEMCO NR 1779N176. PERFORMED OPERATIONAL TEST OF ESCAPE SLIDE DEPLOYMENT IAW AMM 25-62-00-710-051-A TIME TO FULLY DEPLOY 8.32 SECONDS.