What was found
DURING HEAVY CHECK EPSU UNIT 12WL CLASS 1 FAULT DURING A SCHEDULED RON MAINTENANCE. A/C WAS NOT GROUNDED. REMOVED AND REPLACED EPSU BATTERY (12WL) IAW AMM 33-51-38-000-002-A/33-51-38-400-002-A. OPS CHECK GOOD. OK FOR SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK EPSU UNIT 12WL CLASS 1 FAULT DURING A SCHEDULED RON MAINTENANCE. A/C WAS NOT GROUNDED. REMOVED AND REPLACED EPSU BATTERY (12WL) IAW AMM 33-51-38-000-002-A/33-51-38-400-002-A. OPS CHECK GOOD. OK FOR SERVICE.