What was found
PAE - DURING C-CHECK INSPECTION, REPORTED CORROSION ON FLOORBEAM AT BS 294.5 RBL 10 TO LBL 10, WL 208. MAINTENANCE REMOVED CORROSION, FABRICATED REPLACEMENT PARS AND REPAIRED PER SRM 51-40-2, 53-10-8 AND 53-10-51. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PAE - DURING C-CHECK INSPECTION, REPORTED CORROSION ON FLOORBEAM AT BS 294.5 RBL 10 TO LBL 10, WL 208. MAINTENANCE REMOVED CORROSION, FABRICATED REPLACEMENT PARS AND REPAIRED PER SRM 51-40-2, 53-10-8 AND 53-10-51. (M)