What was found
LT AND RT RUDDER CABLES CHAFING ON TOP OF FILL LINE, PN 90-580088-1,TO HYD RESERVOIR AT FUSELAGE STA 150.0 AND 15" LT OF FUSELAGE CTR LINE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LT AND RT RUDDER CABLES CHAFING ON TOP OF FILL LINE, PN 90-580088-1,TO HYD RESERVOIR AT FUSELAGE STA 150.0 AND 15" LT OF FUSELAGE CTR LINE.