What was found
FWD PIT, FUSELAGE FRAME BS 780, INNER CHORD, (SLOPING), BETWEEN S24R AND S25R, HAS A DENT. REMOVED DAMAGED SECTION OF BS 780 FRAME, BETWEEN S24R AND S25R, PER SRM 53-00- 07, REPAIR NR 5. RECEIVED FABRICATED FRAME REPAIR PARTS ON MAE TRAVELER NR T8/772747. LOCATED, DRILLED, TREATED AND PRIMED REPAIR PARTS PER SRM 51-20-01, 51-21-00 AND 51-40-02. INSTALLED BS 780 FRAME REPAIR, BETWEEN S24R AND S25R, PER SRM 51-40-02, 51- 20-05, AND 53-00-07, REPAIR NR 5. THIS REPAIR IS CLASSIFIED AS A CAT "B" MAJOR REPAIR WITH THE FOLLOWING TRACKING REQUIREMENTS: INITIAL AT 37,500 FC AT TIME OF REPAIR OR 50,000 FC WHICHEVER OCCURS FIRST, THEREAFTER EVERY 12,000 FC.