What was found
AFT CARGO PIT, BS 1480, S-26L, FRAME IS BENT AND GOUGED. CUT OUT DAMAGE AREA PER SRM 53-00-07, REPAIR NR 5, AT BS 1480, S-26L. REFORMED AREA PER NTM51-00-19, PART 6, NO CRACKS NOTED. FABRICATED AND RECEIVED REPAIR "J" CHANNEL PER MAE TRAVELER NR T8/772967. LOCATED, DRILLED, TREATED, PRIMED AND INSTALLED REPAIR PARTS AT BS 1480, S-26L, PER SRM 51-40-05, 51-20-01, 51-21-00-7, AND 53-00-07, REPAIR NR 5. THIS REPAIR IS CLASSIFIED AS A CAT "B" MAJOR REPAIR WITH THE FOLLOWING TRACKING REQUIREMENTS: INITIAL AT 37,500 FC; THEREAFTER EVERY 12,000 FC.