What was found
WHILE REMOVING DELETED PARTS PER MAE STUB BEAM MOD, PRODUCTION FOUND NUMEROUS ELONGATED HOLES IN THE CREASE BEAM INNER CHORD AT BS 1180, RT, INCOMING CONDITION, FROM BS 1150-1210, AT RBL 63, CREASE BEAM INNER CHORD REPAIR WAS ACCOMPLISHED, DUE TO DISCREPANCY EFFECTING THE PTF CONVERSION, ON MAE W/C NR 118350453CZ2R03 AND MAE EA 757-5341-16-F2029, REV NEW. THIS NON ROUTINE IS FOR TRACKING PURPOSES ONLY. REPAIR IS CLASSIFIED AS A CAT "A" MAJOR REPAIR.