What was found
MAIN DECK CARGO COMPARTMENT FLOOR TRACK X=-75.25 FLANGE FOUND CORRODED BETWEEN STA 1285 AND 1305. CORROSION REMOVED AS PER SRM 51-21-01 VOL. 2 REV. 40, MATERIAL REMOVED 0.045", ORIGINAL THICKNESS 0.080", REMAINED THICKNESS 0.035" AND FOUND EXCEEDED LIMIT AS PER SRM 53- 70-00 FIG 3 VOL. 1 REV. 40. REPAIR CARRIED OUT AS PER SRM 53-00-52 FIG. 201 REPAIR REV 41. REPAIR CLASSIFIED AS MAJOR AS PER GMM 6-2-100 REV. 107.